1

Detailed Notes on Cast in Situ Piles

News Discuss 
As noticed in the figure underneath, continuous auger is used to drill the borehole, elevate up drilled soil, and pour concrete though the auger is moved up. As a result, the borehole does not need casing or hydrostatic strain to avoid harm to the borehole wall. Traffic congestion proceeds for https://julioz725ucw4.bimmwiki.com/user

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story