Still more work was scheduled to complete the Elster-Saale canal. Such a move would allow small boats to reach the Elbe from Leipzig. The intended completion date has been postponed because of an unacceptable cost-benefit ratio. In the 2010s, Leipzig was often referred to as Hypezig, as overblown comparisons were https://erickxflry.buyoutblog.com/31822665/5-wesentliche-elemente-für-leipzig